SmartCostSeg and Traditional Cost Segregation Firms

Both kinds of study do the same job: sort a building's cost into the right property classes and show the work. The differences are in what the engagement includes, what it leaves out and what you pay for. This page states both sides plainly, names no firm, and makes no promise about results.

What Every Study Must Do

The IRS guide sets the same expectations for every study and prescribes no preparer qualification, standard or methodology; the two facts below are the test both kinds of study are read against.

What a Traditional Engagement Often Includes

Many firms start with calls, proposals, meetings, site visits, and engagement letters.

The line items below are the ones our illustrative fee comparison lists for a typical engagement. They are illustrative, not a survey of any firm.

  • Sales Commissions
  • Business Development & Marketing
  • Travel Time & Site Visits
  • Airfare, Hotels, Mileage & Travel Expenses
  • Telephone Calls & Teleconference Meetings
  • Email Follow-Up & Administrative Coordination
  • Estimated Benefit Analysis & Proposal Preparation
  • Engagement Letter Preparation & Contract Administration
  • Project Management & Internal Meetings
  • Professional Analysis & Report Preparation

What a SmartCostSeg Study Includes and Leaves Out

The analysis is the only thing you pay for. Calls, proposals and meetings are not required to get a study, and a short call is available if you want one. A visit may be needed for some properties; the study is modeled from your documents and photographs and says so, and names what was not performed in its scorecard.

  • Simple 7 step process, with the documents and photographs you already have
  • Engine-computed estimate presented instantly, always as ranges
  • One complete study, sized to your property, ready for your tax advisor

Which Fits Which Property

A property whose study rests on a full on site take off, or on an engineer walking the whole building, is better served by a traditional engagement. A property whose owner wants a documented, modeled study built from the record, with the return shown before commitment, is ours; a visit may still be needed for some of those properties, and the study says what was and was not performed. Neither is the right answer for every building.

Questions people ask

Is a modeled study a real cost segregation study?

The IRS guide's expectations are printed above with their sources. Our study is structured around them and prints which quality elements are met, which are partial and which were not performed.

What does the fee pay for, compared with a traditional study?

Traditional engagements price in site visits, sales meetings, proposals, travel and overhead. Our software carries the heavy lifting and our professional team reviews every study before it is delivered, so the analysis is the only thing you pay for. The fee comes with your study when it is ready to view; no payment is requested before then.

Will a traditional firm find more than SmartCostSeg?

We do not claim that, and we do not claim the reverse. The result depends on the building, the documents and the position chosen, and every estimate is a range, never a guarantee.

The rules on this page were checked against their sources on October 1, 2026.

Ready when you are.

The wizard asks the questions for your property and routes it to the right lane.